the frame is - the thermal insulation is mounted


the lower part is already plastered

the latest work to be done for the Jacuzzi
the Jacuzzi in the new wellness area invites you to swim

panoramic views of the Gosaukamm with striking miter

entrance to the spa - massage room and treatment room with sliding tray

steam

here arises the SAUNA

a toilet for the disabled created
new lounge and new conservatory

lounge and conservatory

view from the bar towards a new buffet area

view from the bar to the restaurant - Access to the conservatory

All rooms "Lammertal" and "Aualm" have new beds - new mattresses to be delivered

the floor in the suites was moved

as well who was thirsty ......

Restaurant - Looking Kitchen

Sunday, November 21, 2010

Pokemon World Online Cannot Connect

roof repaired!

was on Tuesday by a sub-FH finally repaired our roof! Now our house looks
finally out again as before :-)

The only minor drawback is that the wood panel is not attached as previously covered, but now you can see on the site of the silver nail heads. Well, if we have to paint the wood in a few years back ne to be the nails with simple white color with painted over and you see nixhts more.

Saturday, November 20, 2010

Learning Football Books

Building Diary: Day 48 - still 28 days to opening!!

And again a week ago. It has again Allerhand done
  • the windows are now all mounted
  • the plastering in the interior have been completed
  • the roof was
  • was extended, the roofing work began
  • the crane removed
  • various containers were already being picked up again
  • the excavator has finished outside the system - creating a beautiful lawn in the spa :-)
  • the Vorabeiten have begun for the screed

Construction Week 7 is almost over


the excavator makes the beautiful outdoor facility - in the summer, we look forward to a beautiful lawn

the windows are mounted - the crane has been dismantled
have started the roofing work

the roof was extended
expansion of 6 rooms to suites - this will create the new living area with comfortable couch

views from the suites to Gosaukamm with today easily concealed miter

expansion of 6 rooms to suites
construction day 48 - still 28 days for the opening on 18 December 2010

the new conservatory is nearly complete - lacking only the finishing touches

also to our employees we thought - a new staff room :-)

Construction Week 7 is over - Does so not so bad, right?


HOLIDAYS ALPENGASTHOF Laemmerhof
in the holiday LAMMERTAL-Dachstein West
from 18 December 2010 - www.laemmerhof.at Eröffnunung with new wellness area
Hotel basic
or new information about the conversion to facebook

Friday, November 12, 2010

Get Cheats For Gpsphone

out ceremony on 12 November 2010

The topping-out ceremony is celebrated when the shell of a building is completed.
And today is also far from us: the bricklayers have contributed their share to the rebuilding - and be celebrated!

the last form panel is set
the bricklaying team from Alpine - Martin Construction

Thursday, November 11, 2010

Smelling Womens Nylon Feet

Construction Diary: Day 40 - only 36 days until opening!

Now it works only really about. Many different companies are now working on the site Lämmerhof.
day 40 is on the site Lämmerhof

structural works for the expansion of the room where finished - it only needs a roof

whether the many workers appreciate the scenery, too ;-)

has Jacuzzi, winter garden, 1 floor with 3 suites, 2 floor with 3 suites


the winter garden:
from bottom to top now a roof over their head

the first windows are already installed - finally it takes no longer in the house :-)

the spa must also no longer in the rain


HOLIDAYS ALPENGASTHOF Laemmerhof
in the holiday LAMMERTAL-Dachstein West
from 18 December 2010 - www.laemmerhof.at Eröffnunung with new wellness area
Hotel basic
or new information about the conversion to facebook

How Do You Get Bearings Out Of Metal Core

HALF TIME - Day 39 on the site Lämmerhof

It has spread apparently HALF TIME that we already have on our site. Today I see a lot of hard workers - all cars from various companies are all over the parking lot.