Birthday Cakes For Golden Birthday

Finally ...

begins the interior!

from later than the end of the 3rd Weeks drying screed, I could see him no more slowly and was always impatient when it is finally going back VISIBLE continues. This

did it then as the construction manager promised, this week.

began on Monday at 2 FHler with the filling work and will this week make even inside the injection cleaning done ... hui, which is now so really fast. The floor is also where dry, so next week can begin even in theory even the tile ... hopefully we fit into their schedule. Is now something stupid at the time because of all holidays.

These weeks according to our construction manager also replaced the window incorrectly delivered and the preparations for the outer wall are made.

Today we had then also the acceptance by our electricians and our FH Doorbell or intercom system is already :-)

Then Björn was assiduous at the weekend and has mounted on our roof rafters schonmal Taubenabwehr ... of which we have with us that is quite a lot and we do not know that we all fully sh ***.

more photos you can find in the gallery.


PS: Oh, and today we have (to a tip from our neighbor Manu - Viebrock Site Journal) discovered a third finger home-construction sign in our development area. Since then, however, stood on it, "If you build it?" with a mobile number. and not "This will house a finger" with the name of the sales consultant, FH will probably have bought the land and building owners will now ... so who wants to build in the beautiful Hennef, the Log! Then stand here in the construction area almost 3 fingers houses:-D