Monday, May 31, 2010

Sitting On Man Stomach

tile work started

When we have arrived at the house on Saturday, waiting for us outside the door looking in our wall and floor tiles.


This morning I am then to be away from work shortly and I talked with the tile-set in which direction the tiles and clarified a few other details. When I
Today after work again was there because I had an appointment with our construction manager, even the first tiles were down in the living room and hallway and up they were already in the hall and turn in the bathroom.

Together, we have clarified some things and discussed, and can hardly believe that next week already, the remaining work will be done ... Plumbing, doors, windows, exchange, laminate, oven ... a tight schedule, then! We are excited :-)

on Thursday or Friday, are there any photos of the finished tile work and the outer wall.

Oh yes, we have ordered the WE again diligently Furniture ... 2 bar stools for the kitchen counter and bathroom furniture that we will not depend, however, on the wall (we do not like drilling into tiles), but still get extra feet. For this bathroom furniture, we decided:

Thursday, May 27, 2010

Recipe On Commercial Of Velveeta And Rotel

We have a water meter

And the outdoor cleaner seems to be finished with his preparations on the facade. Now let's hope it stays dry next week.

He also has the place under the rafters, where the foam insulation / filling (whatever) was broken out, again nicely done and you see nothing more :-)


Wednesday, May 26, 2010

Can You Turn A Weedeater In To A Boat Motor

schedule for this week ... The walls

today called me a surprise at the plasterers. He said he was supposed to plaster on a different site the house, but due to the weather, he moved it and then will begin today at our house to prepare for our field and base trim. Next week he will then plastered with us. The exterior plaster he has today at it and puts him into the house until next week. Super
that our little house from the outside is then finished soon, but I do not turn quite as that weather until the middle or end of next week looks very modest.
The company will this week Tritec their work (heating, final Insulation of pipes, etc. ...) stop us ... and, imagine, we get our water meter at noon tomorrow at last! Will then take a short break for lunch in the little house and catch the rhenag the door (if none of Tritec FH or tomorrow should work on the house).

follow tomorrow Then photos.

Otherwise, do this week is not much more comfortable. Of the tilers we have not heard of and therefore we'd like to think that possibly come until next week.
Let's see ... because our acceptance is planned for the week 24th So in about 3 weeks already :-)

Friday, May 21, 2010

Madison Wi Brazilian Waxing

're done!

... and I must say it looks great! We are really glad we
have opted for the white spray cleaning (grit) to. Now it looks
inside one step from livable.
Oh, switches and sockets are already set and I also have the same electric blinds tried ... 1 functions A! :-)


But I think by the cleaners who wanted to make the preparation for the external cleaning, no one was there. At least I could perceive no change in advance. Maybe next week ... and please press the fingers crossed that next week will begin with the tiles. That would be great!
And maybe then the wrong built-in windows replaced ...?

This week I had also spoken with our construction manager for the blower-door test, because we were not sure if this has been done or not. Since Mr. J. also had no records available to demonstrate the test seems to have been made yet. Phew! Since we have been lucky, because we really would like to be ... is determined interesting :-)

When the Telekom I have finally reached someone. All my contacts are listed either in hospital or are on holidays, but on a lonely Männeken in the relevant planning office for the position and has 3 / 4 weeks at last to take pity on the handset. "Telephone line xxxweg for? Hmm, who is with us still in the planning. "Uh, hi! Telekom do not happen since the end of March that the port in mid-April should be made?? And apparently it was deemed not to pass it necessary to order or us at least to let you know that the responsible agent is sick then the great question. "Yes, how is this electricity and water?" Me: "Yes, they are already since the 15th KW "" Oh, uh ... I carefully time that the order is processed quickly.! ... Yes, do that! * Shake head * ... well, let's see when the look of the giant purple leaves.
Ah yes, the hole for the house connections by the competent general contractors now shut again and tarred. Can you see the telecoms who opens the back ... we do not pay!

The Tritec rhenag and today we have spoken, because we still have no water meter. The company has the Tritec Inbetriebsetzungsantrag already faxed rhenag end of April, but do have the original. Since Triton next week (probably Wednesday) is back in our house, I'll let them know where to bring the original order should. Then hopefully we get the water meter.

So, power is still missing ... by RWE I will not even write them. They should not be surprised if the next few days, our cancellation obtained. Because today I have made the current applications for heat pump and power house in our city works. The also deliver to Hennef are slightly cheaper (and 100% Natural Power!) And with whom we have never had problems. Hope the change works in time for 01.07.!

, enough frustration unloaded ... We are pleased to continue the ongoing interior work and are curious what will happen next week everything.

In this sense ... Happy Whitsun holidays!

Tuesday, May 18, 2010

Birthday Cakes For Golden Birthday

Finally ...

begins the interior!

from later than the end of the 3rd Weeks drying screed, I could see him no more slowly and was always impatient when it is finally going back VISIBLE continues. This

did it then as the construction manager promised, this week.

began on Monday at 2 FHler with the filling work and will this week make even inside the injection cleaning done ... hui, which is now so really fast. The floor is also where dry, so next week can begin even in theory even the tile ... hopefully we fit into their schedule. Is now something stupid at the time because of all holidays.

These weeks according to our construction manager also replaced the window incorrectly delivered and the preparations for the outer wall are made.

Today we had then also the acceptance by our electricians and our FH Doorbell or intercom system is already :-)

Then Björn was assiduous at the weekend and has mounted on our roof rafters schonmal Taubenabwehr ... of which we have with us that is quite a lot and we do not know that we all fully sh ***.

more photos you can find in the gallery.


PS: Oh, and today we have (to a tip from our neighbor Manu - Viebrock Site Journal) discovered a third finger home-construction sign in our development area. Since then, however, stood on it, "If you build it?" with a mobile number. and not "This will house a finger" with the name of the sales consultant, FH will probably have bought the land and building owners will now ... so who wants to build in the beautiful Hennef, the Log! Then stand here in the construction area almost 3 fingers houses:-D